What We Do

Trade Show Project Management

Trade Show Project Management planning starts with scope, crew sizing, and the venue's labor categories - the calls that shape every downstream decision.

Trade Show Project Management priorities

Trade Show Project Management in Raleigh runs against the actual show-week calendar, not a generic plan. The first pass covers the venue, the move-in window, and the labor category the work falls into.

  1. Scope review against Trade Show Project Management - what is in, what is out, what the venue handles.
  2. Crew sizing for Trade Show Project Management matched to the published labor categories.
  3. Freight planning for Trade Show Project Management keyed to the dock schedule, not the show open.
  4. Daily punch list during show hours so Trade Show Project Management stays on track without rework.

How Trade Show Project Management fits the show calendar

The management starts with the show contract and the venue rules. Once those are clear, the scope of the engagement is written down so the build, freight, and install plans share one set of assumptions.

The schedule is mapped against move-in windows and labor categories. The management runs cleaner when the dock time, the rigging slot, and the strike window are all on one page from week one.

Downtown Raleigh Convention Campus covers Downtown Raleigh, Fayetteville Street District, Warehouse District, Convention Center District. This is the primary large-format trade show cluster. Raleigh Convention Center, the Marriott, the Sheraton, nearby performance venues, and walkable downtown support citywide events, off-sites, receptions, and sponsor activations that spill beyond one building.

Crew and labor for Trade Show Project Management

The crew handling the management is sized to the booth scope and the venue's posted labor categories. Calls are placed against those categories rather than negotiated around them on show day.

On-site, one named lead carries the punch list from move-in through strike. That lead is the same voice on the radio during live hours and the same name on the closeout report.

a 298,100-square-foot addition will bring the campus total to 798,100 square feet, which supports long-term positioning around larger citywide meetings and more flexible convention programs, which sets the practical ceiling for a booth program working the market.

Freight and timing for Trade Show Project Management

Freight for the management is keyed to the truck cube, the dock window, and the carrier's documented transit. Late freight is the most common reason a clean plan turns into overtime.

Material handling, drayage, and storage all live inside the management engagement. The lines between exhibitor freight and venue freight are documented before the truck leaves the shop.

Closeout for Trade Show Project Management

Strike on the management works to a written sequence: graphics off, structure broken down, crates labeled, manifest signed, storage tag attached, post-show report drafted.

Closeout doc lands within a day. The next booking starts from that document so the second show is shorter than the first.

Frequently asked questions

What does the Trade Show Project Management engagement actually include?

The management covers the items the brief calls out: scope review, crew planning, vendor coordination, and the show-day supervision tied to the venue rules. Anything outside that scope is either added in writing or stays with the client team.

How early should we start this work planning?

For custom work, 16 to 20 weeks before move-in is the comfortable window. Rentals can land in 8 to 12. Inside 4 weeks the option set shrinks fast and unit costs climb.

Who runs the program on the show floor?

One named lead from the Raleigh team carries the punch list from the dock through strike. They report up daily and are the same person on the radio during live hours.

Can this service carry over to the next show?

Yes. The build, graphics, and freight plan are written so the next city is a re-kit, not a redesign. Storage and refurbishment are scoped at the start, not bolted on later.